The District retained Cinquini & Passarino, Inc. for Land Surveyor Services. Their work is complete and the District now has current topographic maps to use during design and construction. The District also retained Geoshpere Consultants to drill and collect soil samples at all school sites and this field work has been completed. They are currently developing recommendations for foundation design and State-required reports.
Bond Program Manager, George Baranoff, and WRNS Studio architects met with 6th grade teachers and Principal David Finnane to discuss the design process and gather input on whatâs needed to make the current 100 building a good fit for the 6th grade program. The architects are drafting a proposal based on this teacher and staff input. WRNS and George also met with the 7th and 8th grade teachers and David to discuss basic design and relationship between the spaces and other aspects of the proposed design. The architects gathered input and are now considering how to incorporate ideas heard at the meeting.
The Request for Quotation/Request for Proposal for the Lease Leaseback project at White Hill was advertised and sent to potential developers. Proposals are due at the end of August.
Bond Program Manager George Baranoff will be attending all Back to School Nights with draft preliminary designs of each campus and will be available to answer questions.